08 April 2019

Start of construction. October-November!

House number 1

  • The existing base under the building base was dismantled
  • Works on the device of the sheet piling
  • The foundation pit of the building was dug under 1 and 2 sections of the building by 100% under section No. 3 by 60%
  • The existing piles of the first bush of injection piles were tested
  • Work has begun on arranging the building's brown injection piles

House 2

  • The existing base under the base of the building was dismantled
  • Works on the device of the sheet piling